
Ford Construction Uses HeavyJob & HeavyBid on Highway 88
The Highway 88 Carson Pass Project used controlled blasting techniques to lay back the existing vertical rock slope to a 3/4:1 slope, […]
Read more

Ford Construction Uses HeavyJob & HeavyBid on Highway 88
The Highway 88 Carson Pass Project used controlled blasting techniques to lay back the existing vertical rock slope to a 3/4:1 slope, […]
Read more

RE Monks Construction Company Uses HeavyJob & HeavyBid on North Meadows
The North Meadows Extension – Tributary B Outfall in Castle Rock, CO involved the installation of a 10-foot by 6-foot CBC at […]
Read more

Barrett Paving Materials Uses HeavyJob & HeavyBid on Connective Corridor
The Connective Corridor was a three-phase project in which 24 city blocks were fully reconstructed and subsequently connected Syracuse University to […]
Read more

Achen-Gardner Construction Uses HeavyBid on South Arizona Avenue
The South Arizona Avenue Project was a streetscape project consisting of four-lane roadway improvements and wide pedestrian corridors from Frye Road to […]
Read more

Jay-Reese Contractors Uses HeavyBid on The Boardwalk Trail at Lady Bird Lake
The Boardwalk Trail at Lady Bird Lake is a spectacular structure stretching and meandering along the lake shoreline for nearly a […]
Read more

The Ruhlin Company Uses HeavyBid on AMP Willow Island Powerhouse
The AMP Willow Island Powerhouse presented geotechnical challenges given the jobsite’s tight location. Ruhlin had to work around existing site challenges within […]
Read more

Gray & Son, Inc. Uses HeavyBid on Fairfield Parking Lot
Gray & Son bid the Fairfield Parking Lot based on one single plan sheet and was awarded the job based on quantities […]
Read more

Gordon Barr Limited Uses HeavyBid on Bell Boulevard Easterly Extension
The Bell Boulevard Easterly Extension project involved construction of a four-lane arterial road and bridge with an observation deck over the Moira […]
Read more

R.E. Monks Construction Company Uses HeavyBid on Emerald Valley Ranch
Flooding destroyed two dams at Emerald Valley Ranch, which the Broadmoor Hotel had purchased and re-opened after a $4 million renovation […]
Read more

Papich Construction Company Uses HeavyBid on Highway Widening
Work to Widen Highway to Four-Lane Expressway and Construct a Concrete Bridge included realignment and widening of five miles of an existing […]
Read more

Engineering & Construction Innovations Uses HeavyBid on Skiing Park
The Snowmaking & Lighted Trail Development for Cross Country Skiing-Hyland Park Reserve project included the construction of an underground intake structure and […]
Read more

Engineering & Construction Innovations Uses HeavyBid on 1-GV-461 Lift
The 1-GV-461 Relief Lift Station L-81 project is the construction of a new 37-foot by 39-foot cast-in-place concrete lift station 47 feet […]
Read more