OH-Cuyahoga County :: Wilson Mills Road Reconstruction
|
|
Burton Scot Contractors
|
$1,854,698.00
|
|
Terrace Construction
|
$1,898,923.00
|
|
Great Lakes Construction
|
$1,925,120.00
|
|
Karvo Paving
|
$2,102,461.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
California :: Resurface Asphalt from Rout 280, 680, and 101
|
|
Pavex Construction Division
|
$2,615,697.00
|
|
DeSilva Gates Construction
|
$2,678,050.00
|
|
O.C. Jones & Sons, Inc.
|
$2,899,012.50
|
|
R.G.W. Construction, Inc.
|
$2,944,450.00
|
|
(4 more bidders)
|
|
(HCSS customers listed in green.) Back to Top
|
|
Michigan :: I-96 & Wixom Rd. - Interchange Reconstruction
|
|
Dan's Excavating, Inc.
|
$14,891,137.33
|
|
Angelo Iafrate Construction, Inc.
|
$15,178,549.35
|
|
Waterland Trucking Service, Inc.
|
$15,312,166.74
|
|
John Carlo, Inc.
|
$15,737,955.08
|
|
Six S, Inc.
|
$16,159,988.42
|
|
Ric-Man Construction, Inc.
|
$16,489,781.06
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Georgia :: Resurfacing on Oakley Industrial Blvd
|
|
Archer Western Contractors, LTD
|
$5,697,339.25
|
|
E.R. Snell Contractor, Inc.
|
$5,812,525.95
|
|
APAC - Southeast
|
$5,885,291.70
|
|
The Lions Group, Inc.
|
$5,904,458.70
|
|
C.W. Matthews Contracting Co., Inc.
|
$6,268,900.08
|
|
Bruce Albea Contracting, Inc.
|
$6,894,650.80
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Indiana :: Route 47 in Boone County
|
|
Milestone Contractors, LP
|
$1,832,057.56
|
|
Shelly & Sands, Inc.
|
$1,891,709.14
|
|
Rieth Riley Construction
|
$1,956,439.90
|
|
Calumet Asphalt Paving Co., Inc.
|
$2,068,000.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
West Virginia :: DOH Short Creek Flood Repair
|
|
Savage Construction Co.
|
$634,606.00
|
|
James White Construction
|
$661,212.65
|
|
Mountaineer Contractors
|
$694,294.00
|
|
Cast & Baker Corp.
|
$730,106.53
|
|
Green Mountain Company
|
$850,959.40
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Alabama :: Interchange Modifications I-65 at U.S. 45
|
|
J.S. Walton & Company, Inc.
|
$1,552,041.22
|
|
Hosea O. Weaver & Sons, Inc.
|
$1,794,178.48
|
|
John G. Walton Construction Co., Inc.
|
$1,972,678.10
|
|
S.J. & L., Inc.
|
$2,120,184.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Texas :: FM 417 3004 210 48 Rehab Existing Roadway
|
|
Simon Traylor and Sons, Inc
|
$5,652,434.91
|
|
Pinto Construction Co.,Inc.
|
$5,813,795.54
|
|
J-W Payne Construction
|
$6,079,664.39
|
|
CCE, Inc.
|
$6,197,262.97
|
|
A.K. Gillis and Sons, Inc.
|
$6,385,444.85
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Wisconsin :: Pleasant Prairie Shoreline Restoration and Path Construction
|
|
CW Purpero
|
$676,048.00
|
|
James Cape and Sons
|
$692,039.00
|
|
DK Contractors
|
$736,040.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Indiana DOT Hendricks County - RS-24774-A
|
|
Rieth Riley Construction Company
|
$998,700.00
|
|
Shelly & Sands, Inc.
|
$1,042,926.00
|
|
E & B Paving, Inc.
|
$1,044,299.00
|
|
Calumet Asphalt Paving Co.
|
$1,060,766.00
|
|
Hunt Paving Co.
|
$1,065,263.00
|
|
Milestone Contractors, L.P.
|
$1,081,645.00
|
|
Edsam Construciton, Inc.
|
$1,306,846.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
South Dakota :: Moorcroft Sundance Road, I-90 Misc. Repair
|
|
Foothills Contracting
|
$1,799,181.00
|
|
Larry's Inc.
|
$1,899,132.00
|
|
D H Blattner and Sons
|
$2,034,959.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Michigan MDOT :: M-5 Reconstruction 101
|
|
Angelo Iafrate Construction Co.
|
$20,574,679.64
|
|
Tony Angelo Cement Construction
|
$20,876,632.98
|
|
Dan's Excavating
|
$21,814,293.14
|
|
Six-S, Inc.
|
$24,696,989.49
|
|
John Carlo, Inc.
|
$24,977,293.91
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
PENN DOT :: Venango - GR 1-00-501 - (015116) - April 6, 2000
|
|
IA Construction
|
$1,139,666.25
|
|
W.L. Dunn
|
$1,242,632.22
|
|
Glenn O. Hawbaker
|
$1,264,000.00
|
|
Foster Grading Co.
|
$1,318,679.04
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
New Jersey :: Secaucus Road Separation
|
|
Railroad Construction Co., Inc.
|
$23,751,614.00
|
|
Perini/Slattery Skanska
|
$25,480,862.00
|
|
George Harms Const. Co., Inc.
|
$26,859,230.00
|
|
Anselmi and DeCicco Co., Inc.
|
$26,867,445.00
|
|
Schiavone Construction Co.
|
$31,445,845.00
|
|
J D'Annunzio and Sons, Inc.
|
$31,617,976.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Pennsylvania PennDOT :: SR 0921-004
|
|
Pennsy Supply
|
$721,163.30
|
|
Stewart and Tate
|
$745,405.70
|
|
Leon Wintermeyer
|
$778,226.00
|
|
Kinsley Construction
|
$880,974.45
|
|
Blooming Glen Contr.
|
$959,564.70
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Minnesota :: 3806-57 Lake County
|
|
Hoover Construction Co.
|
$3,838,486.25
|
|
D. H. Blattner & Sons
|
$3,877,650.86
|
|
Louis Leustek & Sons, Inc.
|
$3,901,065.68
|
|
Carl Bolander & Sons Co.
|
$4,814,807.43
|
|
Reuben Johnson & Son, Inc.
|
$5,407,061.61
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Massachusetts :: Brightman Street Bridge
|
|
Modern Continental Construction
|
$32,637,671.00
|
|
Middlesex Corporation
|
$34,259,640.00
|
|
J.F. White Contracting
|
$34,335,232.00
|
|
Jay Cashman, Inc.
|
$35,621,319.00
|
|
Perini Corporation
|
$42,372,043.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Ohio ODOT :: 488(00) SR 259-0.42 E0CV-022
|
|
Ruhlin
|
$9,847,047.00
|
|
C.J. Mahan
|
$9,903,131.00
|
|
Kokosing
|
$9,958,040.00
|
|
Complete General
|
$10,856,782.00
|
|
Becdir
|
$11,095,570.00
|
|
Great Lakes
|
$11,160,708.00
|
|
National Engineering
|
$12,209,024.00
|
|
Beaty Construction
|
$12,379,243.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Illinois Edwardsville, IL Rte 143 over I-55
|
|
Keller Construction, Inc.
|
$1,388,556.03
|
|
Keeley and Sons
|
$1,392,978.00
|
|
Halverson
|
$1,516,179.00
|
|
Killian Corp.
|
$1,664,492.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Wyoming Rehab of US 85
|
|
Simon Contractors
|
$2,791,997.00
|
|
Rissler and McMurry Co.
|
$2,953,009.00
|
|
JTL Group, Inc.
|
$3,019,990.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
California :: Magellan Road Realignment
|
|
O.C. Jones and Sons, Inc.
|
$1,339,695.00
|
|
Granite Const. Co.
|
$1,457,973.00
|
|
Maggiora and Ghilotti, Inc.
|
$1,485,485.00
|
|
Desilva Gates Construction
|
$1,488,884.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
West Virginia WV DOH :: Huff Junction Upgrade 4 Lane Road
|
|
Heeter Construction, Inc.
|
$16,774,282.00
|
|
Elmo Greer and Sons, Inc.
|
$16,794,881.70
|
|
Kanawha Stone Company
|
$17,750,615.95
|
|
Vecellio and Grogan, Inc.
|
$23,227,586.05
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Oregon :: Washington County Road and Recycle
|
|
Baker Rock Resources
|
$1,058,139.00
|
|
Eagle-Eisner, Inc.
|
$1,137,127.00
|
|
Morse Bros. Inc.
|
$1,160,087.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Florida FDOT :: Project US-41 Business Bypass w/ 2 Bascule Bridges
|
|
GLF Construction Corp.
|
$27,589,105.95
|
|
Johnson Bros. Corp.
|
$27,999,707.19
|
|
Jones Bros. Corp
|
$28,993,338.22
|
|
Archer-Western Contractors
|
$29,279,635.86
|
|
Misener Marine Construction
|
$30,173,480.65
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
New York :: SE 759 Arbutus Avenue, Staten Island
|
|
JRC Construction Corp.
|
$19,881,988.00
|
|
Carp Construction
|
$20,420,000.00
|
|
Cruz Construction
|
$21,874,000.00
|
|
Bedford Construction Corp.
|
$22,754,000.00
|
|
Northeast Construction
|
$23,216,000.00
|
|
Rosewood Contracting
|
$27,390,000.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
North Carolina :: US-17 Willington Bypass
|
|
GLF Construction Corporation
|
$84,485,028.00
|
|
Jones Brothers
|
$94,718,773.02
|
|
Ballast Nedam Construction
|
$99,180,722.60
|
|
Tidewater
|
$102,692,674.55
|
|
Granite Construction
|
$136,034,961.16
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Kansas :: Decatur Co -Cold Recycle & Bituminous Overlay
|
|
Shears
|
$2,139,167.00
|
|
Ritchie Paving
|
$2,140,871.00
|
|
Venture Corp.
|
$2,154,314.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
PENNDOT LETTING AUGUST 24, 2000 BUCKS - SR 263 (S33) - (061268)
|
|
Road-Con, Inc.
|
$2,174,199.50
|
|
Trinity Paving Co.
|
$2,364,452.70
|
|
J.D. Eckman
|
$2,431,407.80
|
|
James D. Morrissey
|
$2,592,438.68
|
|
Crisdel Group
|
$2,614,755.70
|
|
Inter County Paving Assoc.
|
$3,589,036.02
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Pennsylvania Turnpike Commission :: Contract #99-016-RX25 Cumberland County
|
|
Jay Fulkroad and Sons, Inc.
|
$2,406,458.80
|
|
IA Construction Corp.
|
$2,505,735.60
|
|
J.D. Eckman
|
$2,537,587.75
|
|
Carmen Paliotta Contracting
|
$2,864,211.13
|
|
Upon This Rock Construction
|
$3,331,250.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Pleasant Prairie Shoreline Restoration and Path Construction, Wisconsin
|
|
CW Purpero
|
$676,048.00
|
|
James Cape and Sons Co.
|
$692,039.00
|
|
DK Contractors Inc
|
$736,040.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
South Dakota :: Moorcroft Sundance Road, I-90 Miscellaneous Repair
|
|
Foothills Contracting
|
$1,799,181.00
|
|
Larry's Inc.
|
$1,899,132.00
|
|
DH Blattner and Sons
|
$2,034,959.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Oregon :: Washington County Road and Recycle Project ID: 710006537
|
|
Baker Rock Resources
|
$1,058,139.00
|
|
Eagle-Elsner Inc.
|
$1,137,127.00
|
|
Morse Bros Inc.
|
$1,160,087.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
3.06 Kilometers of asphalt concrete pavement and bridge rehab on Meadowbrook, Ocean and Wantagh Parkways in the town of Hempstead, NY
|
|
J D Posillico, Inc.
|
$5,656,980.86
|
|
Newborn Construction, Inc.
|
$5,682,347.00
|
|
Bi-County Paving Corp.
|
$5,831,771.35
|
|
Guy Pratt, Inc.
|
$6,026,026.00
|
|
Yonkers Contracting Co., Inc.
|
$6,177,102.25
|
|
Kings Park Industries, Inc.
|
$6,444,444.00
|
|
Pav-Co Asphalt
|
$6,457,000.00
|
|
Grace Industries, Inc.
|
$6,823,767.40
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Contract # D258272 - Queens County, New York - Reconstruction of the BQE (from Broadway to 25th Avenue) - January 20, 2000
|
|
Slattery Skanska, Inc.
|
$215,800,000.20
|
|
Perini* / Tutor Saliba
|
$223,108,895.42
|
|
Tully Construction Co., Inc.
|
$254,578,406.26
|
|
Yonkers Contracting* / Grow Tunneling
|
$279,141,000.50
|
|
Modern Continental Const. Co., Inc.
|
$301,728,642.75
|
|
* HCSS Customer
|
|
(HCSS customers listed in green.) Back to Top
|
|
NYDOT - D258425 - KINGS - 04/20/2000
|
|
Perini Corp.
|
$42,244,985.70
|
|
Defoe Corp.
|
$42,619,272.90
|
|
Koch/Slattery (JV)
|
$42,816,135.50
|
|
Halmar Builders Of New York, Inc
|
$44,325,412.30
|
|
Kiewit Construction
|
$47,953,897.50
|
|
Yonkers Contracting Co., Inc.
|
$48,765,299.35
|
|
E E Cruz Company, Inc
|
$49,780,880.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
NYDOT - D258176 - NASSAU - 04/20/2000
|
|
J D Posillico/Peter Scalamandre (JV)
|
$20,477,000.00
|
|
Cal-Tran Associates, Inc.
|
$21,836,971.00
|
|
Newborn/Bi-County Const (JV)
|
$23,731,454.00
|
|
North Star Contracting Corp.
|
$24,061,000.00
|
|
Defoe Corp.
|
$24,318,296.25
|
|
Bi-County Paving Corp.
|
$24,686,053.90
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
NYDOT - D258422 - NASSAU & SUFFOLK - 04/20/2000
|
|
Cal-Tran Associates, Inc.
|
$7,975,703.00
|
|
Bi-County Paving Corp.
|
$8,965,589.81
|
|
Newborn/Bi-County Const (JV)
|
$9,857,346.00
|
|
Jana Group, Inc.
|
$12,970,706.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Ohio DOT Ashland / Wayne Counties, Project 037(2000), IR 71, Major Widening
|
|
Shelly & Sands, Inc.
|
$32,310,453.13
|
|
E.S. Wagner Co.
|
$33,131,859.25
|
|
Great Lakes Construction
|
$35,045,943.67
|
|
S.E. Johnson
|
$35,705,517.64
|
|
Kokosing Construction
|
$36,082,615.72
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
PENN DOT - McKean - GR 2-00-ST5 - (025087) - April 6, 2000
|
|
Glenn O. Hawbaker
|
$3,454,994.45
|
|
HRI, Inc.
|
$3,495,517.17
|
|
New Enterprise Stone & Lime
|
$3,765,585.55
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Florida :: Contract No. 20797
|
|
Ranger Construction
|
$7,740,690.76
|
|
Townsend WR Contracting
|
$7,935,816.00
|
|
Bergeron Land Development
|
$7,959,000.00
|
|
Martin K. Eby, Construction Co.
|
$8,175,690.99
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
NYDOT :: Project D258189
|
|
Yonkers Contracting Co., Inc.
|
$24,771,949.03
|
|
Columbus Construction Corp.
|
$27,165,587.00
|
|
Thalle Construciton Co., Inc.
|
$27,190,190.26
|
|
New Rochelle Contracting Corp.
|
$27,249,235.66
|
|
Halmar Builders of New York, Inc.
|
$29,492,365.09
|
|
Mc Namee Construction Corp.
|
$32,175,000.00
|
|
ECCO III Enterprises, Inc.
|
$32,378,553.84
|
|
Defoe Corp.
|
$32,403,700.81
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Ohio DOT :: Project Number 993001
|
|
Kokosing Construction Co., Inc.
|
$45,480,095.00
|
|
E. S. Wagner Company/Baker Concrete Co.
|
$48,986,887.12
|
|
John R. Jurgensen Company
|
$50,331,360.86
|
|
S. E. Johnson Companies, Inc.
|
$54,556,116.54
|
|
Trumbull Corporation
|
$60,920,698.77
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
City of East Peoria, Illinois - Rec Plex Parking Lot & Street Improvements
|
|
P. J. Hoerr
|
$2,011,744.35
|
|
R. A. Cullinan
|
$2,041,926.05
|
|
Freesen, inc.
|
$2,104,930.35
|
|
Otto Baum
|
$2,269,640.42
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
City of East Peoria, Illinois - Intersection Improvements IL 40 and River Road
|
|
P. J. Hoer
|
$663,287.00
|
|
R. A. Cullinan
|
$687,246.00
|
|
Coulter
|
$711,554.00
|
|
Freesen, Inc.
|
$777,987.00
|
|
Otto Baum
|
$825,763.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Ohio DOT :: Cuyahega County Project 480 (99) IR 271, Tinkers Creek
|
|
The Ruhlin Co., Inc.
|
$4,955,721.00
|
|
The Great Lakes Construction Company
|
$5,079,900.00
|
|
S.E. Johnson Companies
|
$5,339,902.00
|
|
Velotta
|
$5,415,022.00
|
|
Becdir Construction Co.
|
$5,470,306.00
|
|
J.D. Williamson Construciton Co.
|
$5,471,047.00
|
|
National Engineering & Contracting
|
$5,514,446.00
|
|
OHIO Contracting
|
$5,584,144.00
|
|
S.S. Construciton
|
$5,901,412.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Florida DOT :: Pinallas County - SR 679 (256905-1-56-01)
|
|
Johnson Bros. Corp.
|
$7,621,795.35
|
|
GLF Construciton Corp.
|
$7,794,407.34
|
|
Jones Bros., Inc.
|
$8,434,065.01
|
|
Walsh Group LTD. Archer Western
|
$8,683,555.57
|
|
PCL Civil Construciton
|
$8,856,013.41
|
|
Misner Marine, Inc.
|
$8,875,757.00
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Texas DOT :: Harris County - NH 2000 (198)
|
|
Williams Brothers Const. Co., Inc.
|
$36,367,956.36
|
|
Deavers Const. L.P.
|
$36,639,822.62
|
|
J.D. Abrams, Inc.
|
$40,310,725.18
|
|
|
|
(HCSS customers listed in green.) Back to Top
|
|
Florida DOT SR 103/Lane Avenue
|
|
The Milestone Company of Jacksonville
|
$2,595,732.00
|
|
JB Coxwell Contracting, Inc.
|
$2,599,566.00
|
|
Hubbard Construction Company
|
$2,622,622.00
|
|
|
|